30-Inch Water Main Along Lockhill-Selma To DeZavala Elevated Storage Tank

Solicitation No. PS-00078-JP
Status: Selection Approved and Awarded
Awarded: 2/28/20
Due Date: 10:00 AM Wednesday, 9/25/19

Awarded Firm: Moreno Cardenas Inc.

REQUEST FOR QUALIFICATIONS (RFQ)

30-INCH WATER MAIN ALONG LOCKHILL-SELMA

TO DEZAVALA ELEVATED STORAGE TANK

 

The San Antonio Water System (SAWS) is pursuing professional engineering services and accepting Statements of Qualifications (SOQ) from qualified and interested firms (Respondents) in response to this Request for Qualifications (RFQ), for the design and construction of approximately 5,000 linear feet of 30-inch water main along the Lockhill-Selma to DeZavala Elevated Storage Tank. The scope entails the design of large diameter water main for specified project as required by SAWS. This specified project will require engineering services to be performed by the selected qualified engineering firm (Consultant). Consultant must have familiarity working on projects using open-cut and directional drilling construction methods within the City of San Antonio (COSA), Bexar County, Texas Department of Transportation (TXDOT), and other governing agencies’ right-of-way (ROW).

 

The anticipated services will include civil engineering, geotechnical engineering, tunnel engineering, project management, investigation, topographic survey services, subsurface utility engineering, design, construction management, project coordination, preliminary engineering, final design, and other engineering services as necessary for this project. Engineering disciplines under this contract may include civil, environmental, structural, geotechnical, and or other types of engineering and supporting sciences (e.g., geology, environmental, archaeology, etc.).

 

Estimated Timeline

 

August 29, 2019 at 2:00 PM (CDT)... Non-Mandatory Pre-Submittal Conference

September 13, 2019 by 4:00 PM (CDT)......... Receipt of Written Questions Due

September 18, 2019 by 4:00 PM (CDT)...................... Q & A Posted to Website

September 25, 2019 by 10:00 AM (CDT)......................................... SOQs Due

 

The dates listed above are subject to change without notice.

 

Non-Mandatory
Pre-Submittal Meeting

2:00 PM, Thursday Aug. 29, 2019
San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room CR-145

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Attachment III
Aug. 27, 2019
Pre-Submittal Presentation
Aug. 29, 2019
Pre-Submittal Sign-In Sheets
Aug. 29, 2019
Addendum
Sep. 18, 2019