The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CO-00615-SM
|
IFB
|
22-0138
|
12/9/22
|
2023 Annual Asphalt Overlay Work Order Construction Contract, Package 1 Project
|
View Results PDF
|
CO-00614-FG
|
IFB
|
22-0139
|
12/8/22
|
2023 Sanitary Sewer Laterals Renewal and Repair Construction Contract – Pkg 2 Project
|
View Results PDF
|
CO-00603-SM
|
IFB
|
21-0134
|
12/8/22
|
Tinker and Westover Elevated Storage Tanks Demolition Project
|
View Results PDF
|
CO-00613-FG
|
IFB
|
22-0137
|
12/8/22
|
2023 Sanitary Sewer Laterals Renewal and Repair Construction Contract – Pkg 1 Project
|
View Results PDF
|
CO-00609-RL
|
IFB
|
21-4407
|
11/29/22
|
Gallagher Tract 30” & 24” Sewer Extension
|
View Results PDF
|
CO-00604-SM
|
IFB
|
21-6014
|
11/17/22
|
Nacogdoches Pump Station Pipe Cathodic Protection Project
|
View Results PDF
|
CO-00605-FG
|
IFB
|
22-0135 & 23-1402
|
11/8/22
|
2023 Annual Sanitary Sewer Point Repair, MH Adjustment, Laterals Construction – Pkg I
|
View Results PDF
|
CO-00583-FG
|
IFB
|
22-5009
|
11/7/22
|
Dixie Lee Waterline Extension
|
View Results PDF
|
CO-00577-LE
|
IFB
|
21-0516
|
11/1/22
|
CIPP Creekside EARZ - Site 1, CIPP Patch FM 78 - Site 2, and CIPP Lateral Liner Pilot Project
|
View Results PDF
|
CO-00599-LE
|
IFB
|
20-6005
|
10/28/22
|
Ranch Town No. 2 Pump Station Improvements
|
View Results PDF
|
CO-00598-SM
|
IFB
|
22-1521
|
10/19/22
|
Elation at Buckskin Project
|
View Results PDF
|
CO-00592-JP
|
IFB
|
19-2501
|
10/18/22
|
2019 Lift Station Elimination Project Near PortSA
|
View Results PDF
|
CO-00597-JP
|
IFB
|
20-4529
|
10/10/22
|
2020 CMOM PACKAGE 4
|
View Results PDF
|
CO-00519-RL
|
IFB
|
21-4511
|
10/5/22
|
2020 CMOM Package 2B Project
|
View Results PDF
|
CO-00588-RL
|
IFB
|
22-4518
|
9/29/22
|
EARZ Loop 1604 & IH-10
|
View Results PDF
|
CO-00575-SM
|
IFB
|
21-5057
|
9/21/22
|
2023 SMP Package IV (N. San Gabriel) Project
|
View Results PDF
|
CO-00574-FG
|
IFB
|
21-5056 & 21-5554
|
9/21/22
|
2023 SMP Package III (Hermine Blvd, Bartmer Ave)
|
View Results PDF
|
CO-00573-FG
|
IFB
|
21-5055 & 21-5553
|
9/20/22
|
2023 SMP Package II (Glendora, Goodhue, Eisenhauer) Project
|
View Results PDF
|
CO-00572-SM
|
IFB
|
21-5054
|
9/20/22
|
2023 SMP Package I (Refugio, Blaine St, Ward Ave) Project
|
View Results PDF
|
CO-00571-RL
|
IFB
|
22-4523
|
9/14/22
|
BPC East and West Package 2 - Open Cut Project
|