Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 81 - 100 of 816 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00615-SM IFB 22-0138 12/9/22 2023 Annual Asphalt Overlay Work Order Construction Contract, Package 1 Project View Results PDF
CO-00614-FG IFB 22-0139 12/8/22 2023 Sanitary Sewer Laterals Renewal and Repair Construction Contract – Pkg 2 Project View Results PDF
CO-00603-SM IFB 21-0134 12/8/22 Tinker and Westover Elevated Storage Tanks Demolition Project View Results PDF
CO-00613-FG IFB 22-0137 12/8/22 2023 Sanitary Sewer Laterals Renewal and Repair Construction Contract – Pkg 1 Project View Results PDF
CO-00609-RL IFB 21-4407 11/29/22 Gallagher Tract 30” & 24” Sewer Extension View Results PDF
CO-00604-SM IFB 21-6014 11/17/22 Nacogdoches Pump Station Pipe Cathodic Protection Project View Results PDF
CO-00605-FG IFB 22-0135 & 23-1402 11/8/22 2023 Annual Sanitary Sewer Point Repair, MH Adjustment, Laterals Construction – Pkg I View Results PDF
CO-00583-FG IFB 22-5009 11/7/22 Dixie Lee Waterline Extension View Results PDF
CO-00577-LE IFB 21-0516 11/1/22 CIPP Creekside EARZ - Site 1, CIPP Patch FM 78 - Site 2, and CIPP Lateral Liner Pilot Project View Results PDF
CO-00599-LE IFB 20-6005 10/28/22 Ranch Town No. 2 Pump Station Improvements View Results PDF
CO-00598-SM IFB 22-1521 10/19/22 Elation at Buckskin Project View Results PDF
CO-00592-JP IFB 19-2501 10/18/22 2019 Lift Station Elimination Project Near PortSA View Results PDF
CO-00597-JP IFB 20-4529 10/10/22 2020 CMOM PACKAGE 4 View Results PDF
CO-00519-RL IFB 21-4511 10/5/22 2020 CMOM Package 2B Project View Results PDF
CO-00588-RL IFB 22-4518 9/29/22 EARZ Loop 1604 & IH-10 View Results PDF
CO-00575-SM IFB 21-5057 9/21/22 2023 SMP Package IV (N. San Gabriel) Project View Results PDF
CO-00574-FG IFB 21-5056 & 21-5554 9/21/22 2023 SMP Package III (Hermine Blvd, Bartmer Ave) View Results PDF
CO-00573-FG IFB 21-5055 & 21-5553 9/20/22 2023 SMP Package II (Glendora, Goodhue, Eisenhauer) Project View Results PDF
CO-00572-SM IFB 21-5054 9/20/22 2023 SMP Package I (Refugio, Blaine St, Ward Ave) Project View Results PDF
CO-00571-RL IFB 22-4523 9/14/22 BPC East and West Package 2 - Open Cut Project View Results PDF
Results 81 - 100 of 816 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 »