Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
B-22-002-JP
|
IFB
|
|
3/10/23
|
Lease of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-22-002-JP
|
IFB
|
|
3/10/23
|
Lease of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-22-002-JP
|
IFB
|
|
3/10/23
|
Lease of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-22-002-JP
|
IFB
|
|
3/10/23
|
Lease of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-22-002-JP
|
IFB
|
|
3/10/23
|
Lease of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
CO-00523-JP
|
IFB
|
21-6007
|
2/10/23
|
Water Production Facilities Electrical Upgrades
|
View Results PDF
|
CO-00528-RL
|
IFB
|
18-7002
|
1/26/23
|
Highway 90 & General McMullen Pressure Zone Integration Project
|
View Results PDF
|
CO-00632-LE
|
IFB
|
23-0102
|
1/18/23
|
CIPP Patch Repair FM 78 Project
|
View Results PDF
|
CO-00628-RL
|
IFB
|
22-4527
|
1/13/23
|
W-1 Leon Creek: Hwy 151 to Hwy 90 Upper Segment Tie In Connections
|
View Results PDF
|
CO-00620-FG
|
IFB
|
20-1248
|
1/13/23
|
The Woodlands Offsite Water Project
|
View Results PDF
|
CO-00627-FG
|
IFB
|
23-0115 (O&M) & 23
|
1/6/23
|
Pkg 4 2023 Annual Water Distribution Leak Repairs Contract
|
View Results PDF
|
CO-00626-FG
|
IFB
|
23-0114 (O&M) & 23
|
1/6/23
|
Pkg 3 2023 Annual Water Distribution Leak Repairs Contract
|
View Results PDF
|
CO-00623-SM
|
IFB
|
23-0111 & 23-1402
|
1/4/23
|
2023 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation, and Replacement Construction Contract - Package 2
|
View Results PDF
|
CO-00622-SM
|
IFB
|
23-0110 & 23-1402
|
1/4/23
|
2023 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation, and Replacement Construction Contract - Package 1
|
View Results PDF
|
CO-00621-JP
|
IFB
|
22-4523
|
1/4/23
|
BPC East and West Sewershed Package 2 - Open Cut (ReBid)
|
View Results PDF
|
CO-00610-RL
|
IFB
|
22-1001
|
12/16/22
|
Gallagher Tract 16" Water Extension
|
View Results PDF
|
B-22-003-JP
|
IFB
|
|
12/14/22
|
Purchase of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-22-003-JP
|
IFB
|
|
12/14/22
|
Purchase of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-22-003-JP
|
IFB
|
|
12/14/22
|
Purchase of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
CO-00616-SM
|
IFB
|
22-0140
|
12/9/22
|
2023 Annual Asphalt Overlay Work Order Construction Contract, Package 2 Project
|
View Results PDF
|